Bill Sponsor
Senate Bill 810
115th Congress(2017-2018)
A bill to facilitate construction of a bridge on certain property in Christian County, Missouri, and for other purposes.
Active
Active
Passed House on Sep 25, 2017
Overview
Text
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
S. 810 (Reported-in-Senate)

Calendar No. 192

115th CONGRESS
1st Session
S. 810

[Report No. 115–142]


To facilitate construction of a bridge on certain property in Christian County, Missouri, and for other purposes.


IN THE SENATE OF THE UNITED STATES

April 4, 2017

Mr. Blunt (for himself and Mrs. McCaskill) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works

August 2, 2017

Reported by Mr. Barrasso, with an amendment

[Strike out all after the enacting clause and insert the part printed in italic]


A BILL

To facilitate construction of a bridge on certain property in Christian County, Missouri, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Riverside bridge project.

(a) In general.—The Riverside Bridge Project is authorized to be carried out notwithstanding—

(1) any agreement entered unto under, or restriction pursuant to, section 404(b)(2) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)(2)); or

(2) any other Federal restriction that requires the covered property to be maintained for open space, recreation, or wetland management.

(b) Conditions.—As a condition of the authorization under subsection (a), Christian County, Missouri—

(1) shall carry out the Riverside Bridge Project in a manner that ensures that no flood damage attributable to the Project occurs; and

(2) shall be liable for any such flood damage that does occur.

(c) Disaster assistance prohibited.—No Federal financial assistance pursuant to the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.) may be provided with respect to the covered property or any improvements thereon.

(d) Definitions.—In this Act, the following definitions apply:

(1) COVERED PROPERTY.—The term “covered property” means the property—

(A) in Christian County, Missouri;

(B) conveyed to such County by the Riverside Inn, Inc.; and

(C) that is approximately 1.5 acres and 482 lineal feet adjacent to the westerly line of Riverside Road to the center of Finley Creek.

(2) RIVERSIDE BRIDGE PROJECT.—The term “Riverside Bridge Project” means the project to construct and operate a bridge on and over the covered property.

SECTION 1. Riverside bridge project.

(a) In general.—The Riverside Bridge Project is authorized to be carried out notwithstanding—

(1) any agreement entered unto under, or restriction pursuant to, section 404(b)(2) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170c(b)(2)); or

(2) any easement or other Federal restriction pursuant to that Act (42 U.S.C. 5121 et seq.) that requires the covered property to be maintained for open space, recreation, or wetland management.

(b) Conditions.—As a condition of the authorization under subsection (a)—

(1) Christian County, Missouri, or an assignee shall—

(A) carry out the Riverside Bridge Project in a manner that ensures that no flood damage attributable to the Project occurs; and

(B) be liable for any such flood damage that does occur; and

(2) the Federal Government shall not be liable for future flood damage that is caused by the Project.

(c) Disaster assistance prohibited.—No future disaster assistance from any Federal source may be provided with respect to the covered property or any improvements thereon.

(d) Definitions.—In this Act, the following definitions apply:

(1) COVERED PROPERTY.—The term “covered property” means the property—

(A) in Christian County, Missouri;

(B) conveyed to such County by the Riverside Inn, Inc.; and

(C) that is approximately 1.5 acres and 482 lineal feet adjacent to the westerly line of Riverside Road to the center of Finley Creek.

(2) RIVERSIDE BRIDGE PROJECT.—The term “Riverside Bridge Project” means the project to construct, maintain, and operate a bridge on and over the covered property.


Calendar No. 192

115th CONGRESS
     1st Session
S. 810
[Report No. 115–142]

A BILL
To facilitate construction of a bridge on certain property in Christian County, Missouri, and for other purposes.

August 2, 2017
Reported with an amendment