Bill Sponsor
Senate Bill 1570
116th Congress(2019-2020)
Aquifer Recharge Flexibility Act
Introduced
Introduced
Introduced in Senate on May 21, 2019
Overview
Text
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
S. 1570 (Reported-in-Senate)

Calendar No. 276

116th CONGRESS
1st Session
S. 1570

[Report No. 116–155]


To provide flexibility to allow greater aquifer recharge, and for other purposes.


IN THE SENATE OF THE UNITED STATES

May 21, 2019

Mr. Risch introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

October 29, 2019

Reported by Ms. Murkowski, with an amendment

[Strike out all after the enacting clause and insert the part printed in italic]


A BILL

To provide flexibility to allow greater aquifer recharge, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Aquifer Recharge Flexibility Act ”.

SEC. 2. Definitions.

In this Act:

(1) BUREAU.—The term “Bureau” means the Bureau of Reclamation.

(2) COMMISSIONER.—The term “Commissioner” means the Commissioner of the Bureau.

(3) ELIGIBLE LAND.—The term “eligible land”, with respect to a Reclamation project, means land that—

(A) is authorized to receive water under State law; and

(B) shares a groundwater source with land located in the service area of the Reclamation project.

(4) IN-LIEU RECHARGE.—The term “in-lieu recharge” means the use of surface water instead of pumped groundwater if that use of surface water will cause the direct reduction or elimination of groundwater withdrawals.

(5) NET WATER STORAGE BENEFIT.—The term “net water storage benefit” means an increase in the volume of water that is—

(A) stored in 1 or more aquifers; and

(B) (i) available for use within the area served by a Reclamation project; or

(ii) stored on a long term basis to avoid or reduce groundwater overdraft.

(6) RECLAMATION FACILITY.—The term “Reclamation facility” means each of the infrastructure assets that are owned by the Bureau at a Reclamation project.

(7) RECLAMATION PROJECT.—The term “Reclamation project” means any reclamation or irrigation project, including incidental features thereof, authorized by Federal reclamation law, or constructed by the United States pursuant to such law, or in connection with which there is a repayment or water service contract executed by the United States pursuant to such law, or any project constructed by the Secretary through the Bureau of Reclamation for the reclamation of land.

(8) SECRETARY.—The term “Secretary” means the Secretary of the Interior.

SEC. 3. Flexibility to allow greater aquifer recharge in Western States.

(a) Use of Bureau facilities.—

(1) IN GENERAL.—The Commissioner may allow the use of excess capacity in Bureau conveyance facilities for carriage of non-Reclamation project water for aquifer recharge, subject to applicable rates, charges, and public participation requirements, on the condition that—

(A) the use—

(i) shall not be implemented in a manner that is detrimental to—

(I) any water or power service contract for the Reclamation project; or

(II) any existing obligations for fish, wildlife, or water quality protection;

(ii) shall be consistent with existing water quality guidelines for the Reclamation project; and

(iii) shall comply with all applicable Federal and State law and policies of the Bureau of Reclamation; and

(B) the non-Federal party to an existing contract for water or water capacity in a Reclamation facility shall consent to the use of the Reclamation facility under this subsection.

(2) EFFECT ON EXISTING CONTRACTS.—Nothing in this subsection affects a contract—

(A) in effect on the date of enactment of this Act; and

(B) under which the use of excess capacity in a Bureau conveyance facility for carriage of non-Reclamation project water for aquifer recharge is allowed.

(b) Aquifer recharge on eligible land.—

(1) IN GENERAL.—Subject to paragraphs (3) and (4), a holder of a water service or repayment contract for a Reclamation project may—

(A) directly use water available under the contract for aquifer recharge on eligible land; or

(B) enter into an agreement with an individual or entity to transfer water available under the contract for aquifer recharge on eligible land.

(2) AUTHORIZED PROJECT USE.—Notwithstanding any other provision of law, the use of water for aquifer recharge under paragraph (1) shall be considered an authorized use for the Reclamation project under the reclamation laws.

(3) MODIFICATIONS TO CONTRACTS.—The Secretary may modify an existing water contract described in paragraph (1) if the Secretary determines that the modification is—

(A) necessary to allow for the use of water available under the contract for aquifer recharge under this subsection;

(B) in the best interest of the Reclamation project and the United States; and

(C) approved by the association of water users that is responsible for repaying the cost of construction, operations, and maintenance of the facility that delivers the water under the contract.

(4) REQUIREMENTS.—The use or transfer of water for aquifer recharge under this subsection shall be subject to the requirements that—

(A) the use or transfer shall not be implemented in a manner that is detrimental to any water or power service for the Reclamation project; and

(B) before the use or transfer, the Secretary shall determine that the use or transfer—

(i) (I) results in a net water storage benefit for the Reclamation project; or

(II) contributes to the recharge of a depleted aquifer on eligible land; and

(ii) complies with all applicable Federal and State laws and policies.

(c) In-Lieu recharge.—To the extent consistent with State laws and policies, in-lieu recharge may be carried out under this Act.

(d) Sense of Congress.—It is the sense of Congress that—

(1) the Secretary should encourage the use of public land administered by the Bureau of Land Management for aquifer recharge, where appropriate, consistent with—

(A) the existing grant of right-of-way;

(B) as applicable, the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); and

(C) applicable land and resource management plans; and

(2) the Secretary should consider whether aquifer recharge may be appropriate in certain areas of critical environmental concern, if aquifer recharge—

(A) would enhance the values for which the area of critical environmental concern has been designated; and

(B) is consistent with the management requirements for the area of critical environmental concern.

(e) Conveyance for aquifer recharge purposes.—The holder of a right-of-way, easement, permit, or other authorization to transport water across public land administered by the Bureau of Land Management is authorized to transport water for aquifer recharge purposes, including outside of the regular period of use, without requiring additional authorization from the Secretary where the use does not expand or interfere with the operation of the right-of-way, easement, permit, or other authorization across public land.

(f) Exemption.—This Act shall not apply to the State of California.

SECTION 1. Short title.

This Act may be cited as the “Aquifer Recharge Flexibility Act ”.

SEC. 2. Definitions.

In this Act:

(1) BUREAU.—The term “Bureau” means the Bureau of Reclamation.

(2) COMMISSIONER.—The term “Commissioner” means the Commissioner of Reclamation.

(3) ELIGIBLE LAND.—The term “eligible land”, with respect to a Reclamation project, means land that—

(A) is authorized to receive water under State law; and

(B) shares an aquifer with land located in the service area of the Reclamation project.

(4) NET WATER STORAGE BENEFIT.—The term “net water storage benefit” means an increase in the volume of water that is—

(A) stored in 1 or more aquifers; and

(B) (i) available for use within the authorized service area of a Reclamation project; or

(ii) stored on a long-term basis to avoid or reduce groundwater overdraft.

(5) RECLAMATION FACILITY.—The term “Reclamation facility” means each of the infrastructure assets that are owned by the Bureau at a Reclamation project.

(6) RECLAMATION PROJECT.—The term “Reclamation project” means any reclamation or irrigation project, including incidental features thereof, authorized by Federal reclamation law or the Act of August 11, 1939 (commonly known as the “Water Conservation and Utilization Act”) (53 Stat. 1418, chapter 717; 16 U.S.C. 590y et seq.), or constructed by the United States pursuant to such law, or in connection with which there is a repayment or water service contract executed by the United States pursuant to such law, or any project constructed by the Secretary through the Bureau for the reclamation of land.

(7) SECRETARY.—The term “Secretary” means the Secretary of the Interior.

SEC. 3. Flexibility to allow greater aquifer recharge in western states.

(a) Use of reclamation facilities.—

(1) IN GENERAL.—The Commissioner may allow the use of excess capacity in Reclamation facilities for aquifer recharge of non-Reclamation project water, subject to applicable rates, charges, and public participation requirements, on the condition that—

(A) the use—

(i) shall not be implemented in a manner that is detrimental to—

(I) any power service or water contract for the Reclamation project; or

(II) any obligations for fish, wildlife, or water quality protection applicable to the Reclamation project;

(ii) shall be consistent with water quality guidelines for the Reclamation project;

(iii) shall comply with all applicable—

(I) Federal laws; and

(II) policies of the Bureau; and

(iv) shall comply with all applicable State laws and policies; and

(B) the non-Federal party to an existing contract for water or water capacity in a Reclamation facility consents to the use of the Reclamation facility under this subsection.

(2) EFFECT ON EXISTING CONTRACTS.—Nothing in this subsection affects a contract—

(A) in effect on the date of enactment of this Act; and

(B) under which the use of excess capacity in a Bureau conveyance facility for carriage of non-Reclamation project water for aquifer recharge is allowed.

(b) Aquifer recharge on eligible land.—

(1) IN GENERAL.—Subject to paragraphs (3) and (4), the Secretary may contract with a holder of a water service or repayment contract for a Reclamation project to allow the contractor, in accordance with applicable State laws and policies—

(A) to directly use water available under the contract for aquifer recharge on eligible land; or

(B) to enter into an agreement with an individual or entity to transfer water available under the contract for aquifer recharge on eligible land.

(2) AUTHORIZED PROJECT USE.—The use of a Reclamation facility for aquifer recharge under paragraph (1) shall be considered an authorized use for the Reclamation project if requested by a holder of a water service or repayment contract for the Reclamation facility.

(3) MODIFICATIONS TO CONTRACTS.—The Secretary may contract with a holder of a water service or repayment contract for a Reclamation project under paragraph (1) if the Secretary determines that a new contract or contract amendment described in that paragraph is—

(A) necessary to allow for the use of water available under the contract for aquifer recharge under this subsection;

(B) in the best interest of the Reclamation project and the United States; and

(C) approved by the contractor that is responsible for repaying the cost of construction, operations, and maintenance of the facility that delivers the water under the contract.

(4) REQUIREMENTS.—The use of Reclamation facilities for the use or transfer of water for aquifer recharge under this subsection shall be subject to the requirements that—

(A) the use or transfer shall not be implemented in a manner that materially impacts any power service or water contract for the Reclamation project; and

(B) before the use or transfer, the Secretary shall determine that the use or transfer—

(i) results in a net water storage benefit for the Reclamation project; or

(ii) contributes to the recharge of an aquifer on eligible land; and

(C) the use or transfer complies with all applicable—

(i) Federal laws and policies; and

(ii) interstate water compacts.

(c) Conveyance for aquifer recharge purposes.—The holder of a right-of-way, easement, permit, or other authorization to transport water across public land administered by the Bureau of Land Management may transport water for aquifer recharge purposes without requiring additional authorization from the Secretary where the use does not expand or modify the operation of the right-of-way, easement, permit, or other authorization across public land.

(d) Effect.—Nothing in this Act creates, impairs, alters, or supersedes a Federal or State water right.

(e) Exemption.—This Act shall not apply to the State of California.


Calendar No. 276

116th CONGRESS
     1st Session
S. 1570
[Report No. 116–155]

A BILL
To provide flexibility to allow greater aquifer recharge, and for other purposes.

October 29, 2019
Reported with an amendment