Bill Sponsor
House Bill 1119
115th Congress(2017-2018)
Satisfying Energy Needs and Saving the Environment Act
Active
Amendments
Active
Passed House on Mar 8, 2018
Overview
Text
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
H. R. 1119 (Referred-in-Senate)


115th CONGRESS
2d Session
H. R. 1119


IN THE SENATE OF THE UNITED STATES

March 8, 2018

Received; read twice and referred to the Committee on Environment and Public Works


AN ACT

To establish the bases by which the Administrator of the Environmental Protection Agency shall issue, implement, and enforce certain emission limitations for existing electric utility steam generating units that convert coal refuse into energy.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Satisfying Energy Needs and Saving the Environment Act” or the “SENSE Act”.

SEC. 2. Standards for coal refuse power plants.

(a) Definitions.—In this Act:

(1) ADMINISTRATOR.—The term “Administrator” means the Administrator of the Environmental Protection Agency.

(2) BOILER OPERATING DAY.—The term “boiler operating day” has the meaning given such term in section 63.10042 of title 40, Code of Federal Regulations, or any successor regulation.

(3) COAL REFUSE.—The term “coal refuse” means any byproduct of coal mining, physical coal cleaning, or coal preparation operation that contains coal, matrix material, clay, and other organic and inorganic material.

(4) COAL REFUSE ELECTRIC UTILITY STEAM GENERATING UNIT.—The term “coal refuse electric utility steam generating unit” means an electric utility steam generating unit that—

(A) is in operation as of the date of enactment of this Act;

(B) uses fluidized bed combustion technology to convert coal refuse into energy; and

(C) uses coal refuse as at least 75 percent of the annual fuel consumed, by heat input, of the unit.

(5) COAL REFUSE-FIRED FACILITY.—The term “coal refuse-fired facility” means all coal refuse electric utility steam generating units that are—

(A) located on one or more contiguous or adjacent properties;

(B) specified within the same Major Group (2-digit code), as described in the Standard Industrial Classification Manual (1987); and

(C) under common control of the same person (or persons under common control).

(6) ELECTRIC UTILITY STEAM GENERATING UNIT.—The term “electric utility steam generating unit” means an electric utility steam generating unit, as such term is defined in section 63.10042 of title 40, Code of Federal Regulations, or any successor regulation.

(b) Emission limitations To address hydrogen chloride and sulfur dioxide as hazardous air pollutants.—

(1) APPLICABILITY.—For purposes of regulating emissions of hydrogen chloride or sulfur dioxide from a coal refuse electric utility steam generating unit under section 112 of the Clean Air Act (42 U.S.C. 7412), the Administrator—

(A) shall authorize the operator of such unit to elect that such unit comply with either—

(i) an emissions standard for emissions of hydrogen chloride that meets the requirements of paragraph (2); or

(ii) an emission standard for emissions of sulfur dioxide that meets the requirements of paragraph (2); and

(B) may not require that such unit comply with both an emission standard for emissions of hydrogen chloride and an emission standard for emissions of sulfur dioxide.

(2) RULES FOR EMISSION LIMITATIONS.—

(A) IN GENERAL.—The Administrator shall require an operator of a coal refuse electric utility steam generating unit to comply, at the election of the operator, with no more than one of the following emission standards:

(i) An emission standard for emissions of hydrogen chloride from such unit that is no more stringent than an emission rate of 0.002 pounds per million British thermal units of heat input.

(ii) An emission standard for emissions of hydrogen chloride from such unit that is no more stringent than an emission rate of 0.02 pounds per megawatt-hour.

(iii) An emission standard for emissions of sulfur dioxide from such unit that is no more stringent than an emission rate of 0.20 pounds per million British thermal units of heat input.

(iv) An emission standard for emissions of sulfur dioxide from such unit that is no more stringent than an emission rate of 1.5 pounds per megawatt-hour.

(v) An emission standard for emissions of sulfur dioxide from such unit that is no more stringent than capture and control of 93 percent of sulfur dioxide across the generating unit or group of generating units, as determined by comparing—

(I) the expected sulfur dioxide generated from combustion of fuels emissions calculated based upon as-fired fuel samples, to

(II) the actual sulfur dioxide emissions as measured by a sulfur dioxide continuous emission monitoring system.

(B) MEASUREMENT.—An emission standard described in subparagraph (A) shall be measured as a 30 boiler operating day rolling average per coal refuse electric utility steam generating unit or group of coal refuse electric utility steam generating units located at a single coal refuse-fired facility.

Passed the House of Representatives March 8, 2018.

    Attest:karen l. haas,   
    Clerk