Bill Sponsor
House Bill 4376
115th Congress(2017-2018)
Department of Energy Research Infrastructure Act of 2018
Active
Active
Passed House on Feb 13, 2018
Overview
Text
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
H. R. 4376 (Introduced-in-House)


115th CONGRESS
1st Session
H. R. 4376


To direct the Secretary of Energy to carry out certain upgrades to research equipment and the construction of a research user facility, and for other purposes.


IN THE HOUSE OF REPRESENTATIVES

November 13, 2017

Mr. Knight (for himself, Mr. Lipinski, Mr. Smith of Texas, Mr. Weber of Texas, and Mr. Hultgren) introduced the following bill; which was referred to the Committee on Science, Space, and Technology


A BILL

To direct the Secretary of Energy to carry out certain upgrades to research equipment and the construction of a research user facility, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Department of Energy Research Infrastructure Act of 2017”.

SEC. 2. Advanced Light Source upgrade.

(a) In general.—The Secretary of Energy shall provide for the upgrade to the Advanced Light Source described in the publication approved by the Basic Energy Sciences Advisory Committee on June 9, 2016, titled “Report on Facility Upgrades”, including the development of a multi-bend achromat lattice to produce a high flux of coherent x-rays within the soft x-ray energy region.

(b) Definitions.—In this section:

(1) FLUX.—The term “flux” means the rate of flow of photons.

(2) SOFT X-RAY.—The term “soft x-ray” means a photon with energy in the range from 50 to 2,000 electron volts.

(c) Start of operations.—The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the upgrade under this section occurs before December 31, 2026.

(d) Funding.—Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out the upgrade under this section—

(1) $20,000,000 for fiscal year 2018;

(2) $50,000,000 for fiscal year 2019;

(3) $80,000,000 for fiscal year 2020;

(4) $80,000,000 for fiscal year 2021;

(5) $52,000,000 for fiscal year 2022;

(6) $22,000,000 for fiscal year 2023; and

(7) $6,000,000 for fiscal year 2024.

SEC. 3. Linac Coherent Light Source II high energy upgrade.

(a) In general.—The Secretary of Energy shall provide for the upgrade to the Linac Coherent Light Source II facility described in the publication approved by the Basic Energy Sciences Advisory Committee on June 9, 2016, titled “Report on Facility Upgrades”, including the development of experimental capabilities for high energy x-rays to reveal fundamental scientific discoveries. The Secretary shall ensure the upgrade under this section enables the production and use of high energy, ultra-short pulse x-rays delivered at a high repetition rate.

(b) Definitions.—In this section:

(1) HIGH ENERGY X-RAY.—The term a “high energy x-ray” means a photon with an energy at or exceeding 12 kiloelectron volts.

(2) HIGH REPETITION RATE.—The term “high repetition rate” means the delivery of x-ray pulses up to one million pulses per second.

(3) ULTRA-SHORT PULSE X-RAYS.—The term “ultra-short pulse x-rays” means x-ray bursts capable of durations of less than one hundred femtoseconds.

(c) Start of operations.—The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the upgrade under this section occurs before December 31, 2025.

(d) Funding.—Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out the upgrade under this section—

(1) $20,000,000 for fiscal year 2018;

(2) $55,000,000 for fiscal year 2019;

(3) $80,000,000 for fiscal year 2020;

(4) $80,000,000 for fiscal year 2021;

(5) $54,000,000 for fiscal year 2022; and

(6) $31,000,000 for fiscal year 2023.

SEC. 4. Facility for Rare Isotope Beams.

(a) In general.—The Secretary of Energy shall provide for a Facility for Rare Isotope Beams to advance the understanding of rare nuclear isotopes and the evolution of the cosmos.

(b) Facility capability.—In carrying out subsection (a), the Secretary shall provide for, at a minimum, a rare isotope beam facility capable of 400 kW of beam power.

(c) Start of operations.—The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the facility under this section occurs before June 30, 2022, with early operation in 2018.

(d) Funding.—Out of funds appropriated to the Office of Science, there shall be made available to the Secretary to carry out activities, including construction of the facility, under this section—

(1) $101,000,000 for fiscal year 2018;

(2) $103,000,000 for fiscal year 2019;

(3) $104,000,000 for fiscal year 2020;

(4) $105,000,000 for fiscal year 2021; and

(5) $106,000,000 for fiscal year 2022.