Bill Sponsor
Senate Bill 2082
119th Congress(2025-2026)
Nuclear REFUEL Act of 2025
Introduced
Introduced
Introduced in Senate on Jun 12, 2025
Overview
Text
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
No Linkage Found
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
S. 2082 (Introduced-in-Senate)


119th CONGRESS
1st Session
S. 2082


To amend the Atomic Energy Act of 1954 to modify the definition of “production facility” to exclude an equipment or device capable of reprocessing spent nuclear fuel in a manner that does not separate plutonium from other transuranic elements.


IN THE SENATE OF THE UNITED STATES

June 12, 2025

Mr. Husted (for himself and Mr. Whitehouse) introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works


A BILL

To amend the Atomic Energy Act of 1954 to modify the definition of “production facility” to exclude an equipment or device capable of reprocessing spent nuclear fuel in a manner that does not separate plutonium from other transuranic elements.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Nuclear Recycling Efficient Fuels Utilizing Expedited Licensing Act of 2025” or the “Nuclear REFUEL Act of 2025”.

SEC. 2. Exclusion from definition of production facility.

Section 11 v. of the Atomic Energy Act of 1954 (42 U.S.C. 2014(v)) is amended, in the second sentence, by striking “separating the isotopes of uranium or enriching uranium in the isotope 235” and inserting “(A) separating isotopes of uranium or enriching uranium in the isotope 235; or (B) reprocessing spent nuclear fuel in a manner that does not separate plutonium from other transuranic elements”.