Bill Sponsor
House Bill 6633
119th Congress(2025-2026)
High-Capacity Grid Act
Introduced
Introduced
Introduced in House on Dec 11, 2025
Overview
Text
Introduced
Dec 11, 2025
Latest Action
Sep 14, 2026
Origin Chamber
House
Type
Bill
Bill
The primary form of legislative measure used to propose law. Depending on the chamber of origin, bills begin with a designation of either H.R. or S. Joint resolution is another form of legislative measure used to propose law.
Bill Number
6633
Congress
119
Policy Area
Energy
Energy
Primary focus of measure is all sources and supplies of energy, including alternative energy sources, oil and gas, coal, nuclear power; efficiency and conservation; costs, prices, and revenues; electric power transmission; public utility matters.
Sponsorship by Party
House Votes (0)
Senate Votes (0)
No House votes have been held for this bill.
Summary

High-Capacity Grid Act

This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.

Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.

A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.

The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.

Text (1)
December 11, 2025
Actions (10)
09/14/2026
Placed on the Union Calendar, Calendar No. 723.
09/14/2026
Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-824.
07/21/2026
Ordered to be Reported (Amended) by the Yeas and Nays: 49 - 0.
07/21/2026
Committee Consideration and Mark-up Session Held
07/20/2026
Committee Consideration and Mark-up Session Held
06/24/2026
Forwarded by Subcommittee to Full Committee (Amended) by Voice Vote.
06/24/2026
Subcommittee Consideration and Mark-up Session Held
12/11/2025
Referred to the House Committee on Energy and Commerce.
12/11/2025
Referred to the Subcommittee on Energy.
12/11/2025
Introduced in House