Bill Sponsor
House Bill 9339
119th Congress(2025-2026)
Affordable Innovation for the Grid Act
Introduced
Introduced
Introduced in House on Jun 18, 2026
Overview
Text
Introduced in House 
Jun 18, 2026
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
Introduced in House(Jun 18, 2026)
Jun 18, 2026
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
H. R. 9339 (Introduced-in-House)


119th CONGRESS
2d Session
H. R. 9339


To require the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, and for other purposes.


IN THE HOUSE OF REPRESENTATIVES

June 18, 2026

Mrs. Harshbarger (for herself and Mr. Mullin) introduced the following bill; which was referred to the Committee on Energy and Commerce


A BILL

To require the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Affordable Innovation for the Grid Act”.

SEC. 2. Assessment on use of artificial intelligence and high-performance computing technologies to enhance bulk-power system.

(a) Assessment.—Not later than 90 days after the date of enactment of this Act, the Secretary of Energy, in consultation with the Federal Energy Regulatory Commission and the Electric Reliability Organization, shall conduct an assessment on the use of artificial intelligence and high-performance computing technologies, including an assessment of the employment of probabilistic operating techniques by artificial intelligence and high-performance computing technologies, to enhance the capacity, reliable operation, and operational efficiency of the bulk-power system.

(b) Matters.—The assessment conducted under subsection (a) shall include an assessment of—

(1) the potential for artificial intelligence and high-performance computing technologies to expedite generator and load interconnection studies;

(2) the current applications, and levels of adoption, of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system; and

(3) any technical, regulatory, cybersecurity, or operational limitation affecting such adoption.

(c) Report.—Not later than one year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report on the assessment conducted under subsection (a), including recommendations to—

(1) overcome any limitation assessed under subsection (b)(3); and

(2) facilitate the adoption and integration of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system.

(d) Definitions.—In this section, the terms “bulk-power system”, “Electric Reliability Organization”, and “reliable operation” have the meanings given those terms in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).