Bill Sponsor
Senate Bill 491
115th Congress(2017-2018)
A bill to reinstate and extend the deadline for commencement of construction of a hydroelectric project involving Clark Canyon Dam.
Introduced
Introduced
Introduced in Senate on Mar 2, 2017
Overview
Text
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
Not Scanned for Linkage
About Linkage
Multiple bills can contain the same text. This could be an identical bill in the opposite chamber or a smaller bill with a section embedded in a larger bill.
Bill Sponsor regularly scans bill texts to find sections that are contained in other bill texts. When a matching section is found, the bills containing that section can be viewed by clicking "View Bills" within the bill text section.
Bill Sponsor is currently only finding exact word-for-word section matches. In a future release, partial matches will be included.
S. 491 (Introduced-in-Senate)


115th CONGRESS
1st Session
S. 491


To reinstate and extend the deadline for commencement of construction of a hydroelectric project involving Clark Canyon Dam.


IN THE SENATE OF THE UNITED STATES

March 2, 2017

Mr. Daines (for himself, Mr. Tester, Mr. Risch, and Mr. Crapo) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources


A BILL

To reinstate and extend the deadline for commencement of construction of a hydroelectric project involving Clark Canyon Dam.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Extension of time for a Federal Energy Regulatory Commission project involving Clark Canyon Dam.

Notwithstanding the time period described in section 13 of the Federal Power Act (16 U.S.C. 806) that would otherwise apply to the Federal Energy Regulatory Commission project numbered 12429, the Federal Energy Regulatory Commission (referred to in this section as the “Commission”) shall, at the request of the licensee for the project, and after reasonable notice and in accordance with the procedures of the Commission under that section, reinstate the license and extend the time period during which the licensee is required to commence construction of project works for the 3-year period beginning on the date of enactment of this Act.