To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Active
Amendments
Active
Passed House on Apr 25, 2018
Overview
Text
Introduced
Jun 29, 2017
Latest Action
Apr 26, 2018
Origin Chamber
House
Type
Bill
Bill
The primary form of legislative measure used to propose law. Depending on the chamber of origin, bills begin with a designation of either H.R. or S. Joint resolution is another form of legislative measure used to propose law.
Bill Number
3144
Congress
115
Policy Area
Water Resources Development
Water Resources Development
Primary focus of measure is the supply and use of water and control of water flows; watersheds; floods and storm protection; wetlands. Measures concerning water quality may fall under Environmental Protection policy area.
Sponsorship by Party
House Votes (2)
Senate Votes (0)
Question
On Passage
Status
Passed
Type
Roll Call Vote
Roll Call Vote
A vote that records the individual position of each Member who voted. Such votes occurring on the House floor (by the "yeas and nays" or by "recorded vote") are taken by electronic device. The Senate has no electronic voting system; in such votes, Senators answer "yea" or "nay" as the clerk calls each name aloud. Each vote is compiled by clerks and receives a roll call number (referenced in Congress.gov as a "Record Vote" [Senate] or "Roll no." [House]).
Roll Call Type
Yea-And-Nay
Roll Number
153
House Roll Call Votes
Summary

This bill requires the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers to operate the Federal Columbia River Power System (FCRPS) in a manner consistent with the document titled "Endangered Species Act Section 7(a)(2) Supplemental Biological Opinion," dated January 17, 2014, until the later of September 30, 2022, or the date upon which a subsequent final biological opinion for FCRPS operations is in effect with no pending further judicial review.

Such entities may amend the supplemental opinion and operate the FCRPS accordingly before such date if the entities agree that: (1) the amendments are necessary for public safety or transmission and grid reliability; or (2) the actions, operations, or other requirements that the amendments remove are no longer warranted.

No structural modification, action, study, or engineering plan may restrict electrical generation at any FCRPS hydroelectric dam or limit navigation on the Snake River in Washington, Oregon, or Idaho unless authorized by Congress.

Text (4)
April 26, 2018
April 25, 2018
April 18, 2018
June 29, 2017
Amendments (1)
Apr 25, 2018
Offered in House
0
Sponsorship
House Amendment 545
Pursuant to the provisions H.Res. 839, the amendment printed in Part B of House Report 115-650 is considered adopted.
Submitted
Public Record
Record Updated
Jan 11, 2023 1:37:42 PM